Eurovea Tower
| Eurovea Tower | |
|---|---|
Interactive map of the Eurovea Tower area | |
| General information | |
| Status | Completed |
| Type | Residential |
| Location | Ružinov, Bratislava, Slovakia, 821 09 Ružinov, Slovakia |
| Coordinates | 48°08′23″N 17°07′38″E / 48.13983°N 17.12722°E |
| Construction started | 2019 |
| Completed | 2023 |
| Height | |
| Roof | 168 m (551 ft) |
| Technical details | |
| Structural system | Concrete |
| Floor count | 46 |
| Floor area | 12,400 m2 (133,000 sq ft) |
| Lifts/elevators | 6 |
| Design and construction | |
| Architect | GFI Architektúra + Dizajn |
| Developer | J&T Real Estate, a.s. |
| Main contractor | STRABAG AG; SYTIQ as; VHS-PS, S.R.O. |
| Website | |
| Eurovea Tower | |
Preview warning: Page using Template:Infobox building with deprecated parameter "start_date". Replace with "construction_start_date".
The Eurovea Tower is a premium high-rise residential skyscraper in Bratislava, Slovakia. The building was inaugurated in 2022 and stands at 168 metres (551 ft) tall, being divided into 46 floors. It is the tallest building in Slovakia and the first skyscraper over 150 m (490 ft) built in the country. The tower is part of the Eurovea City complex and housing 389 apartments.