Centenary Building
| Centenary Building | |
|---|---|
The Centenary Building in 2009 | |
Location within Greater Manchester | |
| General information | |
| Location | Salford, Greater Manchester, England |
| Construction started | June 1994 |
| Completed | December 1995 |
| Demolished | 2025 |
| Cost | £3.2 million |
| Client | University of Salford |
| Design and construction | |
| Architect | Stephen Hodder |
| Structural engineer | AMEC |
| Awards and prizes |
|
Preview warning: Page using Template:Infobox building with deprecated parameter "map_alt". Replace with "pushpin_map_alt".
Preview warning: Page using Template:Infobox building with deprecated parameter "start_date". Replace with "construction_start_date".
Preview warning: Page using Template:Infobox building with deprecated parameter "demolition_date". Replace with "demolished_date".
Preview warning: Page using Template:Infobox building with deprecated parameter "map_type". Replace with "pushpin_map".
The Centenary Building was a building at the University of Salford in Greater Manchester, England. It was designed by the architect Stephen Hodder, completed in December 1995, and opened in 1996. The building won the RIBA Award and inaugural Stirling Prize in 1996, as well as the Civic Trust Award in 1998.
In October 2024, the Twentieth Century Society submitted a listing application for the building citing its architectural significance. In November 2024, the University of Salford announced plans to demolish the building. The plans were met with opposition, including from the original architect. Demolition subsequently commenced in early 2025 and was completed by the end of October.