China Railway CR300BF

China Railway CR300BF
CR300BF-0006 displayed at Beijing National Railway Test Centre
In service
  • 24 December 2020 (2020-12-24)
ManufacturerCRRC Tangshan
CRRC Changchun Railway Vehicles
ReplacedCRH1, CRH2, CRH5
Formation8 cars (4M4T)
Capacity613 (48 first class / 565 second class)
598 (5 business / 28 first class / 565 second class) for AF-1005~1009
Operators China Railway
Specifications
Train lengthapprox. 209 m (686 ft)
Maximum speed
  • Service:
  • 250 km/h (160 mph)
  • Design:
  • 300 km/h (190 mph)
Traction systemWater cooling IGBT-VVVF inverter control (Zhuzhou CRRC Times Electric)
Traction motorsYJ-305A CRRC Yongji Electric squirrel-cage three-phase AC motor|three-phase AC traction motors (4×4 units)
Electric system(s)25 kV 50 Hz AC Overhead catenary
Current collectionPantograph
BogiesBolsterless air spring bogies
Braking system(s)Regenerative braking, direct electro-pneumatic braking
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The CR300BF Fuxing (Chinese: 复兴号; pinyin: Fùxīng Hào) is one of the electric multiple unit developed for China Railway High-speed network ordered by China Railway from CRRC Changchun Railway Vehicles. All Chinese standard EMUs operating on China's passenger dedicated lines and high-speed railways are named "Fuxing".