Buca Belediyesi (İzmir Metro)
Buca Belediyesi | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| General information | ||||||||||||||||
| Location | Menderes Cd., Vali Rahmi Bey Mah., 35370 Buca | |||||||||||||||
| Coordinates | 38°23′27″N 27°09′32″E / 38.390965°N 27.159009°E | |||||||||||||||
| System | İzmir Metro rapid transit station | |||||||||||||||
| Owned by | İzmir Metropolitan Municipality | |||||||||||||||
| Operated by | İzmir Metro A.Ş. | |||||||||||||||
| Line | ||||||||||||||||
| Tracks | 2 | |||||||||||||||
| Construction | ||||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | 2027 (expected) | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Buca Belediyesi is a proposed underground station on the Üçyol—Fuar İzmir Line of the İzmir Metro. It will be located beneath Menderes Avenue Buca. Construction of the station, along with the metro line, began in 2024. The station will be located in front of the Buca Tax Administration and one block west of the Buca Municipality building.