Arlesey railway station

Arlesey
Local authorityArlesey, Central Bedfordshire
Managed byGreat Northern
Number of platforms2 (facing 4 tracks)
National Rail annual entry and exit
2020–21 0.153 million
2021–22 0.407 million
2022–23 0.552 million
2023–24 0.592 million
2024–25 0.688 million
Key dates
7 August 1850Opened as Arlsey and Shefford Road
March 1860Renamed Arlesey and Shefford Road
July 1893Renamed Arlesey
July 1895Renamed Arlesey and Shefford Road
1 March 1933Renamed Arlesey and Henlow
5 January 1959Closed
3 October 1988Reopened as Arlesey
Other information
London transport portal
Preview warning: Page using Template:Infobox London station with unknown parameter "grid_position"
Preview warning: Page using Template:Infobox London station with unknown parameter "footnotes"
Preview warning: Page using Template:Infobox London station with unknown parameter "grid_name"
Preview warning: Page using Template:Infobox London station with unknown parameter "code"
Preview warning: Page using Template:Infobox London station with unknown parameter "classification"
Preview warning: Page using Template:Infobox London station with unknown parameter "country"

Arlesey railway station serves the town of Arlesey in Bedfordshire, England. It is 37 miles 3 chains (37.04 miles, 59.61 km) from London King's Cross on the East Coast Main Line. Arlesey is managed by Great Northern, but from December 2019 all services to the station have been operated by Thameslink, due to significant rebranding across their network.

Arlesey is the nearest station to the towns of Stotfold and Shefford, and to the villages of Langford, Clifton and Henlow.