Angle Lake station
The station on its opening day, September 24, 2016 | ||||||||||||||||
| General information | ||||||||||||||||
| Location | 19935 28th Avenue South SeaTac, Washington United States | |||||||||||||||
| Coordinates | 47°25′22″N 122°17′51″W / 47.42278°N 122.29750°W | |||||||||||||||
| System | Link light rail | |||||||||||||||
| Owned by | Sound Transit | |||||||||||||||
| Platforms | 1 island platform | |||||||||||||||
| Tracks | 2 | |||||||||||||||
| Connections | King County Metro (RapidRide) | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Elevated | |||||||||||||||
| Platform levels | 2 | |||||||||||||||
| Parking | 1,160 spaces (garage and surface) | |||||||||||||||
| Bicycle facilities | Racks and lockers | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | September 24, 2016 | |||||||||||||||
| Passengers | ||||||||||||||||
| 5,000 daily weekday boardings (2025) 1,813,320 total boardings (2025) | ||||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Angle Lake station is a light rail station in SeaTac, Washington. It is served by the 1 Line, a Link light rail line that is managed by Sound Transit in the Seattle metropolitan area. The elevated station also includes a large parking garage.
The station was built as part of the South 200th Link Extension project, extending the light rail line south from its terminus at SeaTac Airport via a 1.6-mile-long (2.6 km) elevated guideway. The project was originally approved by voters in the 1996 "Sound Move" ballot measure, with a promise to open in 2006, but was deferred when funding was not found. The 2008 "Sound Transit 2" campaign was approved with funding for the station and extension, estimated to open in 2020; federal grants were obtained to accelerate design and construction, moving up the opening date to late 2016.
The station was originally referred to as the South 200th Street station, but was officially named for the nearby lake in December 2012 by the Sound Transit Board. Construction on the extension began in May 2013 and on the station in September 2014; the project was budgeted at $383 million. Angle Lake station opened to the public on September 24, 2016, and served as the southern terminus of the 1 Line until December 2025.